Memorie Cafe IOI City Mall

Memorie Cafe IOI City Mall

01. Introduction

Everything starts from the basic. Without a quality control on wet works, bricks laying, waterproofing from the site supervisor, there might be unnecessary leaks, poor finishes and more defects to rectify in future. 

02. Preparation Work

The application of bituminous waterproofing coating with additional torch on applied waterproofing membrane, known as APP increase the service-life of the floor. It is important to ensure that the area are always water-tight. No water seepage shall occur in future and bigly reduce the risk of damage to the carpentry work.

03. Detailings

Look at how serious we are in taking care on those detailings, wall partition, lightings and more. Surface protections are greatly done at all time to prevent unwanted scratches. Rectification work shall carried out according to the method statements approved as well to achieve the best quality for the clients.