02. Challenges
The installation works are conducted during night time to avoid shopping mall operation hour. Site preparation is done by covering up the existing floor with canvas. At the same time, our team members are working hard on and off-site. The cabinetry carcass will be done in the factory and it will be transported to site after painting work is completed. This shorten the time on site as installation work can be done rapidly. Minor touch up is then conducted to finishing up the works.